AI Development Methodology

E02 — First semi-annual methodology self-evaluation pass

Pillar (primary): P3 — Doc currency Pillar (secondary): P2 — Doc clarity Status: done Phase: Phase 1 — Foundation Started: 2026-05-25 Closed: 2026-05-25 (maintainer signoff in eval report) Target close: TBD (was opportunistic; landed same-day) Next scheduled run: 2026-11-25 (semi-annual cadence) Owner: maintainer + cross-AI reviewer (fresh session, no prior context)

Closure summary: First end-to-end run of the cycle. 4 autonomous-loop runs produced 59 classified findings, 30 T0/T1 patches shipped as v1.14.0, 28 T2 findings logged for maintainer-authored future work. Self-improving cycle validated at production volume. See self-development/evaluations/2026-05-first-pass.md for the eval report.

Outcome (jobs-to-be-done)

When the methodology has accumulated ~6 months of active use and ~1.x releases, the maintainer wants to systematically re-read every methodology doc cold and classify gaps as “practice is wrong” / “docs are wrong” / “both”, so drift between docs and practice gets caught before it compounds into “the methodology is a fossil.”

Exit criteria (binary)

KPIs

Out of scope

Linked docs

Item roster

See BACKLOG.md for active items (populated in Step 3), ARCHIVE.md for completed, FUTURE.md for deferred.

Open questions

Risks